Wednesday, May 14, 2008

The deck was delivered

W2 ordered the supplies for the deck yesterday at 3:00 p.m. When we got home last night at 5:30 it was there. All of it. It was rather impressive. Curtiss Lumber has definitely done right by us on this one.

I continue to fight with Home Depot over the poor design for the kitchen. The refrigerator door can't open all the way because it hits the molding to the door into the dining room and once we installed the dishwasher I can no longer open the corner cabinet. Someone is coming out to look at it at the end of this week. I wasn't going to make stink, since it is people I used to work with and all, but we've spent too much money to not be able to utilize all of the space and the appliances correctly. So stink, I will make.

The heating duct work is coming along and should be finished today. The stuff we need finished in order to close in the walls. W2 and I will finish wiring, finish installing the bathtub, install the exhaust fans and lights in the bathroom, move a ceiling fan box to over our bed and get ready to close up the walls.

The next few days and weeks will be totally hectic but we're closing in on it and have tentatively scheduled our housewarming party!

No comments: